These reference documents are available to download as you consider providing us feedback:
- Engagement Summary Booklet including feedback form
- Nelson Southern Link Investigation: Strategic Case
- Nelson Southern Link Investigation: Future Forecasting Report
- SH6 Rocks Road Walk / Cycle Facility Options Update Report
- The Draft Programme Business Case for Public Engagement Report
- PBC Options Descriptions Handout
- Arterial Traffic Study, June 2011
- Rocks Rd walking and cycling background, 2014
Bluetooth Data provided by Araflow Ltd
Nelson report 1
- Average total travel time Q1 2015
- Average total travel time Q2 2015
- Average total travel time Q3 2015
- Average total travel time Q4 2015
- Average total travel time Q4 2014
Nelson report 3
- Average total travel time by week Q1 2015
- Average total travel time by week Q2 2015
- Average total travel time by week Q3 2015
- Average total travel time by week Q4 2015
- Average total travel time by week Q4 2014
North Nelson to Brightwater Strategic Study, April 2008
- Comparative Assessment
- Funding Assessment
- Model Building Report 4 Step
- Model Building Report 3 Step: Part1
- Model Building Report 3 Step: Part2
- Outline of Strategy Options
- Port Nelson Access Study
- Public Transport Discussion Document
- Stage 1 Consultation Document
- Stage 1 Consultation Findings
- Stage 2 Consultation Document
- Stage 2 Consultation Finding
- Stage 3 Consultation Document
- Stage 3 Consultation Finding
- Technical Report Executive Summary
- Technical Report
- Travel Demand Management Discussion Document