Information about roadworks in the Wellington-Kāpiti region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week. We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 1
Forest Lakes passing lanes
Crews are tree felling on Wednesday during the day. Expect lane closures.
Tree felling
16 March
Manakau
Crews are tree felling on Thursday during the day by the rail overbridge. Traffic will be controlled by stop/go.
Tree felling
217 March
State Highway 2
Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites. Keep to the temporary speed limit for your safety and the safety of our work crews. Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.
Location | Type of work | Start date |
---|---|---|
Ngauranga to Petone | Resurfacing | No work this week. Crews will be back the week commencing 21 March. |
Gibbons Street, Upper Hutt | Resurfacing | 17 March |
Rimutaka Hill | Drainage works | 15 March |
Kaitoke | Chipsealing | 14 March |
South of Gilbert Street | South of Gilbert Street | 14 March |
South of Rimutaka Bridge number 4 | Chipsealing | 14 March |
South of Topaz Street intersection | Resurfacing | 14 March |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Waikanae
We are doing a small section of resurfacing between Hemi Street and Martin Street on Thursday night.
Resurfacing
3 March
Lindale
We are resurfacing at night in the sounthbound lanes.
Resurfacing
28 February
Coast Road
Southbound resurfacing work on Centennial Highway between 7pm and 5:30am at night. Traffic controlled by stop/go.
Resurfacing
4 March
Churton Park to Johnsonville
We are resurfacing sections of highway between Churton Park and Johnsonville in the southbound lane on Tuesday night.
Resurfacing
1 March
Ngauranga Gorge
The Johnsonville onramp and Newlands southbound offramp are being resurfaced on Sunday and Monday night. Traffic management set up will begin from 7pm and from 10pm to 5:30am the ramp will be closed and a diversion in place. The diversions are via Churton Park and Glover St further down the Gorge - depending on which direction you are heading. The diversions will be clearly signed.
Resurfacing
28/29 February
Johnsonville Motorway
The Johnsonville motorway heading north will be closed while some lighting poles are replaced. Traffic management set up will begin from 7pm and from 10pm to 5:30am the northbound section of highway will be closed. The diversion is via Johnsonville.
Pole replacement
1-3 March
State Highway 2
Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites. Keep to the temporary speed limit for your safety and the safety of our work crews. Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.
Location | Type of work | Start date |
---|---|---|
Ngauranga to Petone | Resurfacing | February and March |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Location | Type of work | Start date |
---|---|---|
Tawa | Tree felling | 14 and 15 |