Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2965

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 28 May - Saturday 3 June . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

 

Sunday 28 May - Saturday 3 June

State Highway 2

                            

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 28 th    

  
  

Mon 29 th

  
  

Tue 30 th   

  
  

Wed 31 st  

  
  

Thu 1 st

  
  

Fri 2 nd

  

   

  
  

Sat 3 rd 

  

Mt Bruce, north of Kiriwhakapapa Road

Stop/go traffic control   to repair road

Road repair

7am-5pm

 

 

 

 

 

 

High Street/Chapel Street roundabout, laying skid-resistant surface on the approach from the north

A detour will be in place from about 8pm using Short Street, South Road, Queen Street and Crayne StreetPOSTPONED TO MONDAY

Southbound stop/go  traffic control to lay skid-resistant surface

Paving

7pm-5.30am

 

 

 

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control   at various sites to:

- Replace signs

- Clear drains

Signs, drainage

8am-4pm

 

 

                                                                       

State Highway 53

                              

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 28 th    

  
  

Mon 29 th

  
  

Tue 30 th   

  
  

Wed 31 st  

  
  

Thu 1 st

  
  

Fri 2 nd

  

  

  
  

Sat 3 rd 

  

Featherston, rural zone to South Featherston Road/Camp   Road intersection

Stop/go traffic control for tree maintenance

Vegetation control

8am-3.30pm

 

 

 

 

 

 

Bidwells Cutting, south of intersection with SH53

Stop/go traffic control to clear slip

Slip clearing

7am-5pm

 

 

 

 

 

 

                             

                       

                         

                                

                   

                                

 


Viewing all articles
Browse latest Browse all 2965

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>