Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2965

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 28 May- Saturday 3 June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

 

Sunday 28 May - Saturday 3 June 2017

State Highway 1  

                           

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 28 th    

  
  

Mon 29 th

  
  

Tue 30 th   

  
  

Wed 31 st  

  
  

Thu 1 st

  
  

Fri 2 nd

  

  

  
  

Sat 3 rd 

  

Cobham Drive/Evans Bay Parade intersection

Caution required for   work on pedestrian islands, part of traffic signals upgrade

Link to information leaflet

Traffic signals

9am-3pm

 

 

Vivian   Street to Basin Reserve

Stop/go traffic control to repaint road markings

Road marking

7pm-5.30am

 

 

Karo Drive, from south of Victoria Street to   Willis Street intersection

POSTPONED TO TUESDAY

Lane closed to apply skid-resistant surface

Link to notice

Paving

7pm-5.30am

 

 

 

 

 

 

 

The Terrace Tunnel closed

Detours signposted via other motorway off and on-ramps while tunnel closed for maintenance

Tunnel

9pm- 5.30am

7pm traffic control set up starts

 

 

 

 

 

 

Tawa, southbound on-ramp

Lane closed to replace   lampposts

Lighting

7pm-5.30am

 

 

Linden, south of Porirua

Lane closed for centre   median construction

Transmission Gully project

7pm-5.30am

   √

 

 

Paremata roundabout, on approach from the south

Northbound lane closed   to repair threshold sign

Signs

9am-3pm

 

 

 

 

 

 

Plimmerton Roundabout, on approach from the north

Southbound lane closed   to apply skid-resistant surface

Paving

7pm-5.30am

 

 

 

 

 

 

Coast Road

Stop/go northbound   traffic control for footpath repairs

Footpath repair

7pm-5.30am

 

 

 

 

 

 

Kapiti Expressway – Raumati Straight and Peka   Peka

Expect traffic controls at various times for finishing works

Expressway   project

Various times day and night

 

   

Old SH1, Paraparaumu to Levin

Lane closed to maintain   power poles – various locations

Electra

8.30am-4.30pm

 

   √

 

Kuku, south of Kuku East Road

Stop/go traffic control for road repair

Road repairs

7.30pm-5.30am

 

 

 

 

 

 

                                                               

State Highway 2

                             

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 28 th    

  
  

Mon 29 th

  
  

Tue 30 th   

  
  

Wed 31 st  

  
  

Thu 1 st

  
  

Fri 2 nd

  

  

  
  

Sat 3 rd 

  

SH2 Ngauranga, intersection and southbound   off-ramp

Lane closed for   resurfacing with asphalt

Paving

7pm-5.30am

 

 

 

 

 

Owen Street, Belmont, intersection

Northbound lane closed to extend and realign right turn lanes

Link to information leaflet

Realign lanes

7pm-5.30am

   

 

SH2/58 Haywards Hill interchange

Lane closures for interchange finishing works

SH2/58 project

7pm-5.30am

   

 

Whakatiki Street intersection

Southbound detour for road surface repair

Paving

7pm-5.30am

 

 

 

 

 

 

Upper Hutt, Gibbons Street intersection north and   south

Follow the detour signs

Detours while   intersection resurfaced

Link to notice

Paving

7pm-5.30am

 

 

 

Upper Hutt, north of Topaz Street, Birchville

Stop/go traffic control to install new guardrail

Link to notice

Barrier renewal

7pm-5.30am

 

 

Te Marua, south of golf course

Caution required for trucks accessing/exiting riverbank stabilisation works

Link to information leaflet

Riverbank works

8.30am- 3.30pm

 

 

Rimutaka Hill Road

Stop/go traffic control at various sites to:

- Replace signs

- Clear drains

Signs, drainage

8am-4pm

 

 

                                             

                                     

State Highway 58 

                                      

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 28 th    

  
  

Mon 29 th

  
  

Tue 30 th   

  
  

Wed 31 st  

  
  

Thu 1 st

  
  

Fri 2 nd

  

  

  
  

Sat 3 rd 

  

Haywards Hill, north of the quarry

Stop/go traffic control to install ducts under road

SH2/58 project

7pm-5.30am

 

 

                                      

             

 


Viewing all articles
Browse latest Browse all 2965

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>