Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 28 May- Saturday 3 June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar
Sunday 28 May - Saturday 3 June 2017
State Highway 1
Location |
Type of work |
Hours |
Sun 28 th |
Mon 29 th |
Tue 30 th |
Wed 31 st |
Thu 1 st |
Fri 2 nd
|
Sat 3 rd |
Cobham Drive/Evans Bay Parade intersection Caution required for work on pedestrian islands, part of traffic signals upgrade | Traffic signals | 9am-3pm |
| √ | √ | √ | √ | √ |
|
Vivian Street to Basin Reserve Stop/go traffic control to repaint road markings | Road marking | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Karo Drive, from south of Victoria Street to Willis Street intersection POSTPONED TO TUESDAY Lane closed to apply skid-resistant surface | Paving | 7pm-5.30am |
|
| √
|
|
|
|
|
The Terrace Tunnel closed Detours signposted via other motorway off and on-ramps while tunnel closed for maintenance | Tunnel | 9pm- 5.30am 7pm traffic control set up starts | √ |
|
| |
|
|
|
Tawa, southbound on-ramp Lane closed to replace lampposts | Lighting | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Linden, south of Porirua Lane closed for centre median construction | Transmission Gully project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Paremata roundabout, on approach from the south Northbound lane closed to repair threshold sign | Signs | 9am-3pm |
|
|
| √ |
|
|
|
Plimmerton Roundabout, on approach from the north Southbound lane closed to apply skid-resistant surface | Paving | 7pm-5.30am |
|
| √ |
|
|
|
|
Coast Road Stop/go northbound traffic control for footpath repairs | Footpath repair | 7pm-5.30am |
| √ |
|
|
|
|
|
Kapiti Expressway – Raumati Straight and Peka Peka Expect traffic controls at various times for finishing works | Expressway project | Various times day and night |
| √ | √ | √ | √ | √ |
|
Old SH1, Paraparaumu to Levin Lane closed to maintain power poles – various locations | Electra | 8.30am-4.30pm |
| √ | √ | √ | √ | √ |
|
Kuku, south of Kuku East Road Stop/go traffic control for road repair | Road repairs | 7.30pm-5.30am |
|
|
| √ |
|
|
|
State Highway 2
Location |
Type of work |
Hours |
Sun 28 th |
Mon 29 th |
Tue 30 th |
Wed 31 st |
Thu 1 st |
Fri 2 nd
|
Sat 3 rd |
SH2 Ngauranga, intersection and southbound off-ramp Lane closed for resurfacing with asphalt | Paving | 7pm-5.30am |
|
|
| √ | √ |
|
|
Owen Street, Belmont, intersection Northbound lane closed to extend and realign right turn lanes | Realign lanes | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange finishing works | SH2/58 project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Whakatiki Street intersection Southbound detour for road surface repair | Paving | 7pm-5.30am |
|
|
|
| √ |
|
|
Upper Hutt, Gibbons Street intersection north and south Follow the detour signs Detours while intersection resurfaced | Paving | 7pm-5.30am | √ | √ | √ | √ |
|
|
|
Upper Hutt, north of Topaz Street, Birchville Stop/go traffic control to install new guardrail | Barrier renewal | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Te Marua, south of golf course Caution required for trucks accessing/exiting riverbank stabilisation works | Riverbank works | 8.30am- 3.30pm |
| √ | √ | √ | √ | √ |
|
Rimutaka Hill Road Stop/go traffic control at various sites to: - Replace signs - Clear drains | Signs, drainage | 8am-4pm |
| √ | √ | √ | √ | √ |
|
State Highway 58
Location |
Type of work |
Hours |
Sun 28 th |
Mon 29 th |
Tue 30 th |
Wed 31 st |
Thu 1 st |
Fri 2 nd
|
Sat 3 rd |
Haywards Hill, north of the quarry Stop/go traffic control to install ducts under road | SH2/58 project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|