Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 2821 May- Saturday 3 JuneSaturday 27 May 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar
COBHAM DRIVE TRAFFIC SIGNALS PROJECT: Link to information leaflet
Sunday 2821 May - Saturday 3 JuneSaturday 27 May 2017
State Highway 1
Location |
Type of work |
Hours |
Sun 28 |
Mon 29 |
Tue 30 |
Wed 31 |
Thu 1 |
Fri 2
|
Sat 3 |
Cobham Drive/Evans Bay Parade intersection Caution required | Traffic signals | 9am-3pm |
| √ | √ | √ | √ | √ |
|
Vivian Stop/go traffic control | Road marking | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Karo Drive, from south of Victoria Street Lane closed to apply skid-resistant surface | Paving | 7pm-5.30am | | √ | | | |
|
|
The Detours signposted via other motorway off and on-ramps while tunnel | Tunnel | 9pm- 5.30am 7pm traffic control set up starts | √ |
| | √
|
|
|
|
Tawa, southbound on-ramp Lane closed to replace | Lighting | 7pm-5.30am
| √ | √ | √ | √
| √
|
|
|
Linden, south of Porirua Lane closed for centre median construction | Transmission Gully project | 7pm-5.30am | √ | √ | √
| √
| √
|
|
|
Paremata roundabout, on approach from the south Northbound lane | Signs | 9am-3pm | | | | √ | |
|
|
Plimmerton Roundabout, on approach from the north Southbound lane closed to apply skid-resistant surface | Paving | 7pm-5.30am |
|
| √ |
| |
|
|
Coast Stop/go northbound | Footpath repair | 7pm-5.30am | | √ | | | | | |
Kapiti Expressway – Expect traffic controls at various times for finishing works
| Expressway project | Various times day and | | √ | √ | √ | √ | √ | |
Old SH1, Lane closed to maintain power | Electra | 8.30am-4.30pm |
| √ | √ | √ | √ | √ |
|
Kuku, south of Kuku East Road Stop/go traffic control for road repair | Road repairs | 7.30pm-5.30am | | |
| √ |
|
|
|
State Highway 2
Location |
Type of work |
Hours |
Sun 28 |
Mon 29 |
Tue 30 |
Wed 31 |
Thu 1 |
Fri 2
|
Sat 3 |
SH2 Ngauranga, Lane closed for resurfacing with asphalt | Paving | 7pm-5.30am |
|
|
| √ | √ |
|
|
Owen Street, Belmont, intersection Northbound lane closed to extend and realign right turn lanes | Realign lanes | 7pm-5.30am | √ | √ | √ | √ | √ | |
|
SH2/58 Haywards Hill interchange Lane closures for interchange | SH2/58 project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Whakatiki Southbound detour for road surface repair
| Paving | 7pm-5.30am | |
|
|
| √ |
|
|
Upper Hutt, Gibbons Street Follow the detour signs Detours while intersection resurfaced | Paving | 7pm-5.30am | √ | √ | √ | √ |
|
|
|
Upper Hutt, north of Topaz Street, Birchville Stop/go traffic control to install new guardrail | Barrier renewal | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Te Marua, south of golf course Caution required for trucks accessing/exiting riverbank stabilisation works | Riverbank works | 8.30am- 3.30pm |
| √ | √ | √ | √ | √ |
|
Rimutaka Hill Road Stop/go traffic control at various sites to: - Replace signs - Clear drains | Signs, drainage | 8am-4pm |
| √ | √ | √ | √ | √ |
|
State Highway 58
Location |
Type of work |
Hours |
Sun 28 |
Mon 29 |
Tue 30 |
Wed 31 |
Thu 1 |
Fri 2
|
Sat 3 |
Haywards Hill north of the Stop/go traffic control to install ducts under road | SH2/58 project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|