Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2965

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2821 May- Saturday 3 JuneSaturday 27 May 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

COBHAM DRIVE TRAFFIC SIGNALS PROJECT: Link to information leaflet

Sunday 2821 May - Saturday 3 JuneSaturday 27 May 2017

State Highway 1  

                                 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2821thst    

  
  

Mon 2922thnd 

  
  

Tue 3023thrd     

  
  

Wed 3124stth   

  
  

Thu 125stth

  
  

Fri 226ndth  

  

  

  
  

Sat 327rdth 

  

Cobham Drive/Evans Bay Parade intersectionVivian Street, from Victoria Street to Tory   Street

Caution requiredLane closed for   work on pedestrian islands, part of traffic signals upgradefootpath repairs

Traffic signalsFootpath repair

9am-3pm7pm-5.30am

 

 

 

 Vivian  Vivian Street/Tory Street to Basin Reserveintersection

Stop/go traffic controlLane closed to repaint road markingsremove   corrugated steel roof from verandah

Road markingBuilding

7pm-5.30am

 

 

 

 

 

 

Karo Drive, from south of Victoria StreetVivian Street to   Willis Street intersectionBasin Reserve

Lane closed to apply skid-resistant surfaceStop/go traffic control for repainting road lines

PavingLane marking

7pm-5.30am

 

 

 

 

 

 

TheBasin    Reserve, Sussex Street to Cambridge Terrace Tunnel closed

Detours signposted via other motorway off and on-ramps while tunnelLane closed for maintenanceraising level of service chamber lids

TunnelServices

9pm- 5.30am7pm-5.30am

7pm traffic control set up starts

 

 

 

 

 

 

 

Tawa, southbound on-rampThe Terrace Tunnel closed

Lane closed to replaceDetours signposted via  lamppostsother motorway off and on-ramps while tunnel closed for maintenance

LightingTunnel

7pm-5.30amMidnight Thursday - 5.30am

 

 

 

  √

 

 

Linden, south of PoriruaAotea Quay off-ramp closed

Lane closed for centre   median constructionDetour via other off-ramps while quay being resurfaced

Transmission Gully projectPaving

7pm-5.30am

   √

 

 

  √

 

 

 

Paremata roundabout, on approach from the southSouth of Porirua, Linden

Northbound laneLane closed   to repair threshold signfor centre median construction

SignsTransmission Gully project

9am-3pm7pm-5.30am

 

 

 

 

 

 

Plimmerton Roundabout, on approach from the northWeighbridge

Southbound lane closed   to apply skid-resistant surfaceExpect traffic controls for service chamber lid inspection

PavingServices

7pm-5.30am9am-3.30am

 

 

 

 

 

 

 

CoastKapiti Expressway – Raumati Straight, Te Moana   Road off ramp, and Peka Peak end

Stop/go northbound  Expect traffic controlcontrols at various times for footpath repairsfinishing works

Footpath repairExpressway   project

7pm-5.30amVarious times day and night

  

 

 

 

 

    

Kapiti Expressway –New Raumati Straight and Peka   PekaSouth roundabout site, Poplar Avenue/Old SH1 intersection

Expect traffic controls at various times for finishing worksNEW INTERSECTION OPENS WEDNESDAY 4.30pm

 

Expressway   project

Various times day andAll day, night

 

 

 

 

    

Old SH1,SH1 Paraparaumu to- Levin

Lane closed to maintain   powermaintain power poles – various locations

Electra

8.30am-4.30pm

 

   √

 

Kuku, south of Kuku East RoadManakau Rail Overbridge

Stop/go traffic control for road repaircontrol to lay skid-resistant asphalt surface on overbridge

Link to notice

Road repairsPaving

7.30pm-5.30am7pm-5.30am

 

   

 

  √

 

 

 

                                                                                 

                    

State Highway 2

                                                    

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2821thst    

  
  

Mon 2922thnd 

  
  

Tue 3023thrd     

  
  

Wed 3124stth   

  
  

Thu 125stth

  
  

Fri 226ndth  

  

  

  
  

Sat 327rdth 

  

SH2 Ngauranga,Ngauranga intersection and southboundwith Centennial  off-rampHighway/Jarden Mile

Lane closed for   resurfacing with asphalt

Paving

7pm-5.30am

 

 

 

 

 

 

Owen Street, Belmont, intersectionPetone southbound on-ramp closed

Northbound lane closed to extend and realign right turn lanesDetour signposted via Dowse interchange while skid-resistant surface laid over on-ramp

Realign lanesPaving

7pm-5.30am10pm-5.30am

 

 

 

 

    

 

SH2/58 Haywards Hill interchange

Lane closures for interchangefor   interchange finishing works

SH2/58 project

7pm-5.30am

   

 

WhakatikiUpper Hutt, Gibbons Street intersection north and   south

Southbound detour for road surface repairFollow the detour signs

Detours while   intersection resurfaced

Link to notice

Paving

7pm-5.30am

  

 

 

 

 

 

Upper Hutt, Gibbons StreetTotara Park intersection north and   south

Follow the detour signsNorthbound lane closed for guardrail repair

Detours while   intersection resurfaced

PavingBarrier repair

7pm-5.30am9am-3.30pm

 

 

 

 

 

 

Upper Hutt, north of Topaz Street, Birchville

Stop/go traffic control to install new guardrail

Link to notice

Barrier renewal

7pm-5.30am

 

 

Te Marua, south of golf course

Caution required for trucks accessing/exiting riverbank stabilisation works

Riverbank works

8.30am- 3.30pm

 

 

Rimutaka Hill Road

Stop/go traffic control at various sites to:to replace signs

- Replace signs

- Clear drains

Signs, drainageSigns

8am-4pm

 

 

                                             

                                     

State Highway 58 

                                                      

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2821thst    

  
  

Mon 2922thnd 

  
  

Tue 3023thrd     

  
  

Wed 3124stth   

  
  

Thu 125stth

  
  

Fri 226ndth  

  

  

  
  

Sat 327rdth 

  

Haywards Hill north of theby quarry

Stop/go traffic control to install ducts under road

SH2/58 project

7pm-5.30am

 

 

                                      

             

 


Viewing all articles
Browse latest Browse all 2965

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>