Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2965

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 7 May - Saturday 1330 April - Saturday 6 May . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

Sunday 7 May - Saturday 1330 April - Saturday 6 May

State Highway 2

                            

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 7 th   

  
  

Mon 8 th

  
  

Tue 9 th 

  
  

Wed 10 th 

  
  

Thu 11 th

  
  

Fri 12 th  

  
  

Sat 13 th 

  

Lennie Road, Opaki

Stop/go traffic control   to inspect road sub-surface structure

Analysis

8am-5pm

 

 

 

 

 

 

North of Masterton to Clareville

Stop/go traffic control to remove shiny surfaces on chipseal – various sites. Using suction truck to   wire-brush, waterblast and remove excess bitumen

Water cutting

7pm-5.30am

 

 

 

 

Featherston

Stop/go traffic control to resurface SH2/53 intersection with asphalt

Paving

9am-4pm

 

 

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control at various sites to:

-      Resurface with asphalt   south of the summit

-      Replace signs

-      Clear drainage channels

-      Repair guardrails

Link to map

Paving, maintenance

8am-4pm

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 30 th  

  
  

Mon 1st

  
  

Tue 2 nd

  
  

Wed 3 rd

  
  

Thu 4 th

  
  

Fri 5 th  

  
  

Sat 6 th 

  

Clareville

Stop/go traffic control to improve skid resistance by waterblasting a slippery-when-wet section of chipsealed road

Repairs

8am-4pm

 

 

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control   at various sites to:

-Resurface with asphalt, sites south of the summit

Link to map

-Replace signs

-Clear drainage channels

-Repair guardrails

Paving, maintenance

8am-4pm

 

 

                                                                  

                                  

State Highway 53

                                   

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 7 th   

  
  

Mon 8 th

  
  

Tue 9 th 

  
  

Wed 10 th 

  
  

Thu 11 th

  
  

Fri 12 th  

  
  

Sat 13 th 

  

Featherston

Stop/go traffic control to resurface SH2/53 intersection with asphalt

Paving

7pm-5.30am

 

 

 

 

 

 

                                

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 30 th  

  
  

Mon 1st

  
  

Tue 2 nd

  
  

Wed 3 rd

  
  

Thu 4 th

  
  

Fri 5 th  

  
  

Sat 6 th 

  

No major works this   week

 

 

 

 

 

 

 

 

 

                   

                                

 


Viewing all articles
Browse latest Browse all 2965

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>