Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 7 May - Saturday 1330 April - Saturday 6 May . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 7 May - Saturday 1330 April - Saturday 6 May
State Highway 2
Location |
Type of work |
Hours |
Sun 7 th |
Mon 8 th |
Tue 9 th |
Wed 10 th |
Thu 11 th |
Fri 12 th |
Sat 13 th |
Lennie Road, Opaki Stop/go traffic control to inspect road sub-surface structure | Analysis | 8am-5pm |
|
|
|
| √ |
|
|
North of Masterton to Clareville Stop/go traffic control to remove shiny surfaces on chipseal – various sites. Using suction truck to wire-brush, waterblast and remove excess bitumen | Water cutting | 7pm-5.30am | √ | √ | √ |
|
|
|
|
Featherston Stop/go traffic control to resurface SH2/53 intersection with asphalt | Paving | 9am-4pm |
|
|
|
|
| √ |
|
Rimutaka Hill Road Stop/go traffic control at various sites to: - Resurface with asphalt south of the summit - Replace signs - Clear drainage channels - Repair guardrails | Paving, maintenance | 8am-4pm |
| √ | √ | √ | √ |
|
|
Location |
Type of work |
Hours |
Sun 30 th |
Mon 1st |
Tue 2 nd |
Wed 3 rd |
Thu 4 th |
Fri 5 th |
Sat 6 th |
Clareville Stop/go traffic control to improve skid resistance by waterblasting a slippery-when-wet section of chipsealed road | Repairs | 8am-4pm |
| √ |
|
|
|
|
|
Rimutaka Hill Road Stop/go traffic control at various sites to: -Resurface with asphalt, sites south of the summit -Replace signs -Clear drainage channels -Repair guardrails | Paving, maintenance | 8am-4pm |
| √ | √ | √ | √ | √ |
|
State Highway 53
Location |
Type of work |
Hours |
Sun 7 th |
Mon 8 th |
Tue 9 th |
Wed 10 th |
Thu 11 th |
Fri 12 th |
Sat 13 th |
Featherston Stop/go traffic control to resurface SH2/53 intersection with asphalt | Paving | 7pm-5.30am |
|
|
|
|
| √ |
|
Location |
Type of work |
Hours |
Sun 30 th |
Mon 1st |
Tue 2 nd |
Wed 3 rd |
Thu 4 th |
Fri 5 th |
Sat 6 th |
No major works this week |
|
|
|
|
|
|
|
|
|