Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 3023 April - Saturday 6 MaySaturday 29 April . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Anzac Day 25 April: Afternoon commemorations at Anzac Bridge, Mt Bruce. The highway is open but please take care for people walking beside the road.
SH2/58 Haywards intersection: The temporary speed limit helps while you get used to the new layout.
Sunday 3022 April - Saturday 6 MaySaturday 29 April
State Highway 2
Location
Type of work
Location
Type of work
Clareville
Stop/go traffic control to improve skid resistance by waterblasting a slippery-when-wet section of chipsealed road
Repairs
8am-4pm
√
Carterton south, Matarawa Road intersection north of Waiohine River Bridge
Stop/go traffic control to level road shoulders
Road shoulders
8am-4pm
√
Clareville
Stop/go traffic control to improve skid resistance by waterblasting a slippery-when-wet section of chipsealed road
8am-4pm
√
Rimutaka Hill Road
Stop/go traffic control at various sites to:
-Resurface with asphalt south of the summit
-Replace signs
-Clear drainage channels
-Repair guardrails
Paving, maintenance
8am-4pm
√
√
√
√
√
Rimutaka Hill Road
Stop/go traffic control to resurface with asphalt – various sites
Paving
8am-4pm
√
√
√
Rimutaka Hill Road
Stop/go traffic control to repair truck caution sign
Signage
8am-4pm
√
Rimutaka Hill Road, north of the summit
Stop/go traffic control to maintain drains
Drainage
8am-4pm
√
Hours |
Sun 30 |
Mon 1st |
Tue 2 |
Wed 3 |
Thu 4 |
Fri 5 |
Sat 6 |
State Highway 53
Location
Type of work
Location
Type of work
No major works this week
No major works this week
Hours |
Sun 30 |
Mon 1st |
Tue 2 |
Wed 3 |
Thu 4 |
Fri 5 |
Sat 6 |
|
|
|
|
|
|
|
|