Information about roadworks in the Wellington-Kāpiti region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from Sunday 2013 November 2016 . We’ll keep you posted on future works and have regular updates on local radio stations.stations.
State Highway 1
Location | Type of work | Start date |
Paterson St (by the Mt Victoria tunnel) | Sewer works | Sunday to Wednesday night |
Wellington Road | UFB installation work | Sunday to Thursday night |
Paekakariki | Pot hole repairs | Tuesday to Wednesday night |
Terrace off ramp | Sewer repairs | Thursday |
Pukerua Bay | Resurfacing | Monday to Thursday night |
State Highway 2
Location | Type of work | Start date |
Kaitoke | Electronic sign board installation | Monday to Thursday |
Greytown - fruitstalls | Second coat seal chip sealing | Monday to Wednesday |
State Highway 58
Location | Type of work | Start date |
Haywards/Pauatahanui | Flood repair works | Monday to Friday |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Highway post-flood clean-up
Maintenance works are focused on repairs and clearing the highways after Tuesday’s flooding and slips. For road status information, visit www.tfw.govt.nz .
Please plan your journey to allow for delays on the roads while this essential work is done.
Paving projects are cancelled.
Mt Victoria Tunnel lane closure: The northbound lane in Mt Victoria Tunnel will be closed tonight and tomorrow night for work to replace a wastewater pipe near the Paterson St lights
(Wellington Water). The southbound lane will be open.
State Highway 1
Location | Type of work | Start date |
Patterson St (by the Mt Victoria tunnel) | Sewer works | Sunday to Wednesday night |
Wellington Road | UFB installation work | Sunday to Thursday night |
Terrace tunnel | Maintenance | Monday night |
Vivian Street | Loop reinstatement works | Monday night |
Terrace offramp | Sewer main works | Monday to Friday after 9:30am |
Mt Victoria Tunnel | Maintenance | Tuesday night |
Pukerua Bay | Resurfacing | Monday to Thursday night |
State Highway 2
Location | Type of work | Start date |
Rimutaka Hill Road | Chip sealing | Wednesday to Thursday |
North Topaz Street | Chip sealing | Tuesday to Wednesday |
Kaitoke | Electronic sign board installation | Monday to Thursday |
Greytown - fruitstalls | Second coat seal chip sealing | Monday to Wednesday |
Hutt Road-Ngauranga | Resurfacing | Sunday to Tuesday night |
Mikimiki | Chipsealing | Saturday to Thursday |
State Highway 58
Location | Type of work | Start date |
Haywards – Mt Cecil to Paremata | Drainage and slip repair work | Monday night |
Haywards | Construction | Monday to Friday |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.