Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from Sunday 2013 November 2016

State Highway 2

Kaitoke
Traffic will be controlled by stop/go while crews install an electronic sign board by Dews Construction yard.

Electronic sign board installation

Monday to Friday

Greytown - fruitstalls
Traffic will be controlled by stop/go early Monday while crews chip seal the highway just north of Greytown. Following that, traffic follows lanes marked by cones.

Second coat seal chip sealing

Monday to Wednesday

Opaki
Traffic will be controlled by stop/go traffic management for tree maintenance works.

Tree maintenance

Monday to Friday

All network
Road crews are working across the network to clear drains, repair slips and potholes.  Please stick to the temporary speed limit and take extra care driving through work sites.

Repairs following storm damage

Monday to Friday 

Location

Type of work

Start date

State Highway 53

Location

Type of work

Start date

No planned roadworks along SH53 this week  

-

-

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

Rimutaka Hill Road
Traffic will be controlled by stop/go for chip sealing near Pakuratahi Bridge.

Chip sealing

Wednesday to Thursday

North Topaz Street
Traffic will be controlled by stop/go and a temporary speed limit in place for chip sealing works.

Chip sealing

Tuesday to Wednesday

Kaitoke
Traffic will be controlled by stop/go while crews install an electronic sign board by Dews Construction yard.

Electronic sign board installation

Monday to Thursday

Greytown - fruitstalls
Traffic will be controlled by stop/go while crews chip seal the highway just north of Greytown.

Second coat seal chip sealing

Monday to Wednesday

Hutt Road-Ngauranga
Night time road closure for resurfacing works.  Closure scheduled for Sunday night with detour off Hawkestone/Tinakori Road. Aftercare will require lane closures on Monday and Tuesday night. 

Resurfacing

Sunday to Tuesday night

Mikimiki
Traffic will be controlled by stop/go for resurfacing works.  A temporary speed limit will be in place.

Chipsealing

Saturday to Thursday 

Mikimiki
Traffic will be controlled by stop/go to enable dig out repairs and maintenance works.

Dig outs

Monday to Friday

Rimutaka Hill Road
Traffic will be controlled by stop/go for maintenance repairs and dig outs.

Maintenance repairs

Monday to Friday

North of Carterton
A temporary speed limit will be in place while crews lower the lip of the road the north and southbound lanes.

Road repairs

Monday to Tuesday

State Highway 53

Location

Type of work

Start date

Traffic will be controlled by stop/go at various locations while crews install “slippery when wet” signage.  

Sign intallation

Tuesday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

LocationLocation

Type of workType of work

Start dateStart date


Viewing all articles
Browse latest Browse all 2965

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>