Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2965

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 31 October 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 1

Please note:

Tuesday 1 November

Vivian Street resurfacing works are cancelled tonight.

But Tory Street is closed from Haining Street to the intersection with Vivian Street for works to replace traffic signal ducts.

Location

Type of work

Start date

Mt Victoria tunnel
Tunnel closed for maintenance.

Repair and maintenance

Sunday

Forrest Lakes
Lane closures and stop/stop for tree removal works.

Drainage works

Monday to Thursday daytime

Coast Road
Traffic will be controlled by stop/go for to allow crews to resurface sections of the road and repair a section of the wire rope median barrier.

Resurfacing

Sunday to Thursday night

Vivian Street
Lane closures and detours for resurfacing work.

Night closures flyer  - Wed 2 NovNight closures flyer - Mon 31 Oct
Alternative routes flyerAlternative routes flyer - Wed  2 NovMon 31 Oct

Resurfacing

Sunday to Thursday night

Otaihanga roundbaout
Lane closure so crews can install Truck warning signs.

Lighting pole replacement works

Wednesday

Whenua Tapu
Lane closures while crews repair guardrails.

Repair and maintenance

Wednesday night

State Highway 2

Location

Type of work

Start date

Rimutaka Hill Road
Traffic will be controlled by stop/go for guardrail repairs, rock face drainage repairs and pre seal dig outs.

Maintenance and resurfacing

Monday to Friday

Fergusson Drive
Lane closures for footpath construction just north of the River Road lights by Maoribank.

Barrier repairs

Monday to Friday

State Highway 58

Location

Type of work

Start date

Haywards
Traffic will be controlled by stop/go while crews to pre seal repairs to the road surface.

Pre seal repairs

Thursday night

Haywards
Ongoing work by Lanes Flat for Transmission Gully.

 Construction

Monday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 2965

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>